MADIC group
november 2020
TOTAL solarisation campaign: DELTA 3 is ready!
As part of the TOTAL solarisation campaign, MADIC elec Lille and the MADIC head office design office recently completed the construction of the TOTAL service station at the Relais des Hautoits in Hénin Beaumont (62): DELTA 3! The works took place from September to October 2020. 6 shades coupled together for 150 photovoltaic panels were installed, representing a production of 50 kWp.